Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×


 
House project (last one)
On 15 acres built by me and my wife , only subbed out the sheetrock, just too old, too heavy and ceilings too high (18.5’) I spent over 6 years so far.
By now you know I am a workaholic and a little crazy too.
DE9DB401 AC94 4E54 91CA CB2CAA49E8F9
C1741A66 93A6 4041 B706 24CE0944515D
97ECC6AF 424C 4AAC BB43 716FEDEF4E1A
Stone wall finished
Shower floor with side drain
Back side with stucco finished.
Front door solid black walnut, made by me and my wife
cabinet panels, hand rubbed Liberon Tung oil finish
cabinet panels glued and clamped, this 4 panel unit is the back panel for the island cook-top.
cabinet parts mortise and tenon joints for panels
shower 2
shower
same heat tubes different location for a better visualization
just a couple shots of the floor heat, 7 zones of low temp. heat, product called Warm-Board, it is 1 1/8" plywood covered with aluminum to conduct...
floor joists, view from the basement.
Basement floor
Starting first floor frame
looking back at the entry from the scaffold
looking down from the scaffold showing how small the stones on floor look compared to ones in front of me
Looking down from the scaffold
Basement another view
basement
start of basement walls
rear view of house framing, walkout basement 45’ to the top
another view of the pre-installation
 
Disclaimer:

This website is not affiliated with or endorsed by Forest River, Inc. or any of its affiliates. This is an independent, unofficial site.



All times are GMT -5. The time now is 07:55 PM.