Last summer when we were there the construction on 89 between browning and St Mary was long and major, we drove through mud for a few miles. Check the road conditions and if the construction is still ongoing take 464 north out of Browning, it will bring you back onto 89 near Babb, just a few miles north of St Mary and you miss the construction and have a straighter drive too.
__________________
(Previous) Coachmen Mirada Select 37RB
(Previous) Coachmen Freedom Express 246RKS
(Current)2022 Grand Design Reflection150 226RK
2022 F150 Powerboost Hybrid.
|