Quote:
Originally Posted by Witch Doctor
Looks like you only have 2 hydraulic lines coming off the manifold, they are the orange and black lines. There is no way to do what you want, all the other are electrical connections to your pump. I would GUESS that 1 line is for your leveling system and the other is for your slides, with out a whole new manifold and having a separate valve for each slide I can’t see how you could do it. If you change out the system you would be looking at about 4000.00 USD. Like I said this is a guess from your picture
|
That makes sense! I think it is what it is and have to deal with the order of in/out: Bedroom, Front/Door large slide, then the heaviest Kitchen side slide. Whether in or out, the sequence is the same ... If i am the only person here, I guess trying to "push" on or "hold" a certain slide to maybe change that sequence is futile too ...