Picture 2 of 16 from Album Mods
|
 |
Removed factory paneling from overhead bunk because of a water leak. Replaced with shiplap boards, redone window covering and removed the carpet floor and installed wood floor planking on the base of the bed. |
Picture Added 01-07-2021 11:31 PM
Added by MasterBlaster
|
|
Disclaimer:
This website is not affiliated with or endorsed by Forest River, Inc. or any of its affiliates. This is an independent, unofficial site.
All times are GMT -5. The time now is 12:09 PM.