corocky1998
Senior Member
We are adding a 3 piece bathroom to our basement. When I dug up the main today the kitchen sink drain is located where I wanted to hookup the toilet/sink line to the main. The shower was going to connect next to the toilet on the main but there is not enough space on the main.
The shower is on the left side of the main and toilet/sink are on the right side of the main sewer.
Can I run the shower over top the main line, connect it to the sink drain and then both connect to the toilet drain which will connect to the main sewer after the kitchen sink?
I think it is ok, but my concern is I'm basically running the shower drain in a circle to the main sewer.
This will be inspected, so it needs to pass.
Thanks!

The shower is on the left side of the main and toilet/sink are on the right side of the main sewer.
Can I run the shower over top the main line, connect it to the sink drain and then both connect to the toilet drain which will connect to the main sewer after the kitchen sink?
I think it is ok, but my concern is I'm basically running the shower drain in a circle to the main sewer.
This will be inspected, so it needs to pass.
Thanks!
